One control tower for every site
Running five projects means five supply chains, five sets of fires, and no single view. IntelliByld puts every site into one live control tower so materials, risk, and capacity can be balanced across the portfolio, not just within one job.
Multi-Site Control Tower
Balance the portfolio, not just the project
When one site is short on rebar and another is sitting on a surplus, the answer is obvious but only if someone can see both at once. A shared twin makes cross-site moves visible and actionable instead of accidental.
- One source of truth. Every site's materials, schedule, and risk live in the same model, at the same freshness.
- Cross-site moves. Surplus on one job can cover a shortfall on another before either becomes an emergency order.
- Portfolio-level risk. A supplier wobble that touches three sites is seen as one risk, not three disconnected surprises.
Less duplicate buying
Shared visibility means surplus gets used, not re-ordered site by site.
One pane of glass
Executives see every project's supply chain health in a single live view.
Coordinated response
A shared-supplier risk triggers one coordinated plan across all affected sites.
What changes across the portfolio, answered
Do all sites need to be on the same systems?
No. The control tower sits above whatever each site already runs and normalizes the picture. New sites are added by connecting their BOMs and channels just like the same lightweight pilot path.
Can teams still operate independently?
Yes. Each site keeps its own workflow; the tower adds a portfolio layer on top for visibility and cross-site moves, without forcing every project into one process.
Give every site one control tower
Connect one site and see it run in your own data within three weeks.